Kitchen Renovation Cost Dubai

Kitchen renovation cost is easier to compare when cabinetry, worktops, appliances and room work each have their own quantities and supply responsibilities.

Published by 800 Master RenovationsUpdated

Four schedules make a kitchen quote readable

Cabinets
Base, wall and tall units listed separately

Record width, depth, height, door finish, carcass, drawers, hinges and accessories. Confirm whether a run includes gaps for appliances; compare the actual cabinet schedule, not one price per kitchen.

Worktop
Material, thickness, area and edge details

List fabrication, visible edges, sink and hob cut-outs, joints, upstands, delivery and installation. Ask whether the supplier measures purchased slabs or finished surface area.

Appliances
Exact model and purchasing party

Identify who supplies each appliance, its delivery date and whether installation, connection and any cabinets or panels around it are included.

Room work
Removal, finishes and service alterations

Price flooring, splashback, decoration, outlets, plumbing and extraction changes separately. Describe what will be retained after the old kitchen is removed.

Worked arithmetic: cabinet runs are separate

Assume 4 metres of specified base units at an invented AED 1,000/m and 3 metres of specified wall units at an invented AED 700/m. Those cabinet lines total (4 × 1,000) + (3 × 700) = AED 6,100. These are made-up calculation inputs, not market prices or company rates.

A worktop, tall unit, appliance housing and pull-out mechanism still need their own lines unless explicitly included. If a quotation bundles them, request the included dimensions and products. Use the same schedule when asking for a different door finish so the price difference reflects that finish change.

Compare an upgrade with a replacement

DecisionKeep the existing arrangementReplace or relocate it
CabinetryInspect the existing units and specify replacement fronts or repairs.Price complete units, internals, fitting and removal of the old cabinets.
AppliancesConfirm retained models fit the proposed units.Include the new models and the service or housing changes they require.
Sink positionDefine the connection work at the retained position.Identify the proposed new route and the making-good included after inspection.

Appliance allowances

01What should an appliance allowance show?

Show the amount allocated to each appliance and whether it includes delivery, installation and connection. When the model is selected, replace the allowance with its actual supply cost and document any related cabinet or service adjustment.