Kitchen Renovation Planning

Plan the kitchen around what you store, how you cook and the room’s verified service positions. Choose appliance models before final cabinet drawings so openings, power, water and ventilation can be coordinated.

Published by 800 Master RenovationsUpdated

List what needs a place

Walk through a normal cooking session: take ingredients from storage, wash, prepare, cook, serve and clear up. Note the crowded surface, awkward reach or door conflict at each stage. Record how many people use the kitchen together and whether others pass through it. This turns the brief into a working layout test.

Make a storage inventory of pots, small appliances, food, dishes and cleaning items. Note which stay on the worktop and which need power while stored. Include waste and recycling. A cabinet plan should assign these items to usable locations rather than distribute cupboards by appearance alone.

  • Identify a continuous preparation area.
  • Keep regularly used items near their task.
  • Measure appliances and any furniture being retained.

Build the appliance and service schedule

Model information
Record the exact appliance model and installation document.

Include dimensions, required clearances, connections and supplier responsibility.

Openings
Draw doors, drawers and appliance doors open.

Check the fridge beside a wall, dishwasher loading and adjacent cabinet handles.

Services
Mark water, waste, electrical and extraction positions.

Have the relevant trades verify relocation options before fixing the plan.

Maintenance
Show access to valves, traps and serviceable equipment.

Plan removable access where an appliance or fitting may need repair.

Release orders in the right sequence

Keep the product schedule and drawing revision together. A substituted appliance needs its installation requirements checked before the cabinet opening is changed.

  1. 01

    Verify the room

    Measure walls, openings and levels. Identify dimensions or substrate conditions that need checking again after removal.

  2. 02

    Coordinate the layout

    Approve furniture, appliances and service positions together. Resolve worktop joints, sink and hob cut-outs, lighting and splashback junctions in the drawings.

  3. 03

    Confirm fabrication

    Approve joinery details from verified dimensions. Agree with the worktop supplier when templating will occur and which units must be installed first.

  4. 04

    Plan use during work

    Decide how the household will cook, wash dishes and store food during outages. Schedule final connections and function checks before returning the kitchen to use.

Discuss your kitchen renovation project