Renovation and fit-out describe overlapping office projects. For a useful comparison, establish the starting condition, retained work and required occupation standard before using either label in a brief or quotation.

Published by 800 Master RenovationsUpdated

What the terms usually describe

Market usage varies. Attach the measured scope and approval responsibilities whichever term you use.

DecisionRenovationFit-out
Starting pointAn existing fitted office being renewed or reconfigured.An interior being prepared for occupation, often from shell or basic provision.
RetentionExisting partitions, ceilings, services or furniture may remain.The amount of base-building provision and previous tenant work varies.
WorkCan range from decoration to extensive layout and services changes.Can include partitions, ceilings, finishes, services and fitted equipment.
HandoverRenewed areas need checks alongside any retained installation.New systems and occupied areas need testing and completion records.

Describe the premises before choosing the term

Inspect the office with the landlord’s available information. Record partitions, ceiling, floor, AC, electrical distribution and fire-safety systems as retained, altered or replaced. “Fitted” does not mean every item suits the next tenant. A meeting-room layout may need different cooling, technology and acoustic treatment from the previous open workplace.

For a shell space, identify the exact base-building provision and tenant connection points. Request the landlord’s standards and the drawings needed to coordinate the new work. A fit-out quote should show where the contractor’s work ends and where landlord systems, IT, furniture and specialist suppliers begin. Give each interface a named contact and a deliverable so responsibility can be checked.

Use either label with a factual scope

  1. 01

    State the starting condition

    Attach current photographs and a marked plan. Identify unknown conditions that require survey or opening-up.

  2. 02

    List retained and new work

    Name the rooms, systems and products involved. Include removal, making good and protection where new work meets retained areas.

  3. 03

    Allocate approvals and closeout

    State who prepares and submits drawings, answers comments, coordinates inspections and provides completion documents. DDA publishes a specific fit-out route where that authority applies.

  4. 04

    Agree occupation readiness

    Define commissioning, furniture, IT, cleaning and staff move activities. The handover should support the office’s actual use, whichever term appears in the title.